Background

A cigarette manufacturer operating 8 Hauni PROTOS 70 production lines was targeting 90% OEE (Overall Equipment Effectiveness) as a strategic goal. After 18 months of incremental improvements, they were stuck at 82% with the primary bottleneck being unplanned downtime related to spare parts failures.

Analysis

ZTLibre's engineering team conducted a 3-week audit of the facility's spare parts performance across all 8 lines. Key findings included:

  • Cutting blade replacements were inconsistent — some blades lasted 3 weeks, others less than 5 days
  • Garniture tape wear patterns indicated misalignment on 3 of 8 lines
  • Suction tape replacement was reactive, not scheduled
  • No standardized spare parts inventory system across lines

Implemented Solution

Standardized Blade Specifications

All 8 lines were fitted with ZTLibre tungsten carbide blades manufactured to consistent hardness (HRA 89-91) and geometry tolerances. This alone reduced blade-related downtime by 55%.

Predictive Replacement Schedule

Based on production volume data, ZTLibre developed a predictive replacement schedule for garniture tapes and suction tapes. The schedule was integrated into the factory's CMMS, triggering automatic reorder when inventory dropped below safety stock.

Custom Maintenance Kits

ZTLibre designed four customized maintenance kits corresponding to weekly, monthly, quarterly, and annual service intervals. Each kit contained every consumable needed for that service window, eliminating the need for separate purchase orders.

Results at 6 Months

MetricBaselineAfter 6 MonthsImprovement
OEE82%94%+12pp
Unplanned downtime (h/month)248-67%
Annual spare parts cost$195,000$142,000-27%
Inventory accuracy73%96%+23pp
Order-to-delivery lead time21 days9 days-57%

Why This Matters

For cigarette manufacturers operating on thin margins, every percentage point of OEE improvement translates directly to bottom-line results. By taking a systematic, data-driven approach to spare parts management, this factory achieved world-class efficiency without costly capital investment in new machinery.